SafetyFAQContact
Precast Services, Inc. - Logo for banner

57th Street Parking Garage | Precast Concrete Erection Project in West New York, NJ

Service Division: Northeast

Project Overview: Precast Parking Garage Construction in West New York, NJ

Precast Services, a trusted precast erection contractor serving the Northeast, was selected to perform the precast concrete erection of the four-story 57th Street Parking Garage, located on the surface lot between 57th Street and 58th Street in West New York.

Designed to support one of the region’s most densely populated communities, the 57th Street Parking Garage delivers much-needed parking capacity through a multi-story precast concrete structure and reflects the City’s continued investment in durable, space-efficient infrastructure solutions.

Ground view of the completed 57th Street parking garage.

The 57th Street Parking Garage shows how smart infrastructure investment can address long-standing parking challenges in West New York. Through strong partnerships and expert precast construction, Precast Services delivered a durable, space-efficient solution that supports the community’s growth.

Project Scope: Precast Concrete Erection Services

As part of the Northeast Service Division, Precast Services was contracted specifically for the erection of the precast concrete parking structure, coordinating crane operations, sequencing, and installation within a highly constrained urban footprint.

The project scope included:

  • Precast concrete erection for a four-story parking garage
  • Coordination of crane placement and erection sequencing
  • Installation of precast structural components within a full city block
  • Collaboration with utility providers and municipal agencies

This project required experienced precast erection crews capable of executing complex structural installations safely and efficiently in an active urban environment.

Urban Precast Erection Challenges & Technical Planning

Erecting a large precast concrete parking garage in the center of West New York presented significant logistical and engineering challenges. The structure occupies the entire city block between 57th Street and 58th Street, surrounded by residential buildings, active businesses, and narrow city streets.

To complete the precast erection, the crane was required to sit directly in the street. This introduced critical considerations involving:

  • Underground water mains and utilities
  • Overhead telecommunications and power lines
  • Structural impact on adjacent building foundations and basements

Through early coordination and detailed planning, overhead lines were successfully relocated, while underground utilities were protected using a crushed stone crane road and timber crane mats. Street closures were coordinated with the City of West New York, allowing the precast erection process to proceed safely and efficiently.

This level of planning and execution highlights Precast Services’ expertise in urban precast construction, where precision, coordination, and safety are essential to successful project delivery.

Aerial view of a lowered crane in an urban area.
3 Construction workers on the ground in an urban area looking up at a crane.
Elevated view of the bottom part of a raised crane with workers on the ground
Rooftop view of a raised crane in a construction zone under construction.
Ground view of the 57th Street parking garage.

Project Partners & Construction Team

Ground view of a construction site with crane attached to a piece of a section.

The successful completion of the 57th Street Parking Garage was the result of collaboration among experienced construction partners:

  • Precast Manufacturer: High Concrete Group LLC
  • General Contractor: Dinallo Construction Corporation
  • Crane Supplier: Bay Crane
  • Grouting Subcontractor: Construction Resource Services

Each partner played a critical role in delivering a high-quality precast concrete parking structure that meets the City’s infrastructure needs.

Supporting Parking Infrastructure in West New York

The 57th Street Parking Garage directly supports West New York’s long-term efforts to expand parking availability through smart infrastructure investment. As Mayor Gabriel Rodriguez stated:

“Parking has been a challenge for many years in West New York and my administration has been committed to greatly increasing the number of available parking spaces by maximizing our existing spaces in creative new ways, partnering with private entities, and heavily investing in new parking infrastructure.”

This project demonstrates how precast concrete construction and erection can deliver durable, efficient solutions for municipalities facing space limitations and growing demand.

Precast Construction & Erection Services Across the Northeast

With extensive experience in precast construction, precast concrete erection, and parking garage erection, Precast Services continues to deliver reliable structural solutions throughout West New York, New Jersey, and the greater Northeast region.

From multi-story parking garages to complex urban structures, our team brings the planning, expertise, and execution required to successfully erect precast concrete systems in even the most challenging environments.

SCOPE OF PROJECT. This is a block of text. Double-click this text to edit it.
Second Paragraph: OBSTACLES UNCOVERED OR NOTEWORTHY CONTRIBUTIONS
Third Paragraph: OTHER CONTRACTORS INVOLVED IN THE PROJECT
Fourth Paragraph: QUOTE FROM HAPPY CLIENT, OR CONTRACTOR ON PROJECT LEAD
Top
Precast Services, Inc. - Logo for banner
With decades of experience with commercial job sites, we help contractors with large-scale construction projects. The logistics of solving the most complex construction situations is what we thrive on.
chevron-down